Save $1,106.82
Triple Scrub Station
Model AME 1035-06-3 Catalog # USPE-MMC-9879936041262
$3,456.05
$2,349.23
Available to order
Images are representative. Confirm the exact model, configuration, dimensions and included components before ordering.
Use the manufacturer model for technical documentation and purchase orders. This catalog number is our internal reference—not a UPC or GTIN.
$14,779.00$18,993.00
You save $4,214.00 · 22% below compare-at price
Available to order. Final availability is confirmed during fulfillment.
Delivery: Available methods and charges are confirmed for the equipment and destination. Large or specialized equipment may require freight delivery.
Use this product as the starting point. Our team will review compatibility, controls, operating conditions and project scope before preparing a formal response.
U.S. Pathology Equipment supports institutional purchasing and equipment coordination. Cooler catalog expertise is reinforced through MyMortuaryCooler.com, while the product manufacturer and model shown above remain the controlling product identity.
AME 1036-8L Left-Hand Embalming Sink Station is cataloged by U.S. Pathology Equipment for pathology, anatomy, morgue, mortuary, forensic, veterinary, research and institutional facility projects.
The AME 1036-8L Left-Hand Embalming Sink Station from American Mortuary Equipment is a professional 304 stainless steel workstation for embalming rooms, prep rooms, autopsy support areas, pathology labs, anatomy programs, funeral homes, and medical examiner facilities. The left-hand sink configuration suits facilities that need a layout-specific station matching existing plumbing and room design.
Need the opposite layout? View the AME 1036-8R Right-Hand Embalming Sink Station for mirrored prep-room setups or dual-bay installations.
Built from corrosion-resistant 304 stainless steel for sanitation and long-term durability. Every unit includes a left-positioned sink, hydro aspirator with vacuum breaker, flexible spray hose, dissection rinse valve, large instrument drawer, perforated specimen shelf, and a waterproof GFCI receptacle.
Note: the stainless embalming table shown in some images is sold separately and pictured for demonstration only. Contact us for bundle pricing, compatible tables, or a complete prep-room package.
| Specification | Value |
|---|---|
| Model | AME 1036-8L |
| Configuration | Left-hand sink embalming station |
| Material | 304 stainless steel |
| Included utilities | Hydro aspirator, vacuum breaker, spray hose, dissection rinse valve, GFCI receptacle |
| Storage | Large instrument drawer and perforated specimen shelf |
| Alternate configuration | AME 1036-8R Right-Hand Embalming Sink Station |
| Typical lead time | 6–8 weeks |
Can the sink be placed on the right instead? This page is the left-hand station; for the opposite side, view the AME 1036-8R Right-Hand Embalming Sink Station.
Is the embalming table included? No — it is sold separately and shown for demonstration only.
Is it made from stainless steel? Yes, 304 stainless for durability, sanitation, and corrosion resistance.
Does it include an aspirator? Yes — a hydro aspirator with vacuum breaker is standard.
Can it be customized? Yes — layout, plumbing, ventilation, and workflow specs are available; custom options may affect price and lead time.
Pair with adjustable-height autopsy tables, the center-sink embalming station, or the wall-mounted embalming service station. Many buyers add refrigerated body storage: upright and walk-in mortuary coolers, plus racks & lifts.
Call 1-888-792-9315 (Mon–Fri, 9:00 AM–4:30 PM ET) or email Contact U.S. Pathology Equipment. Government and institutional buyers can request a PO quote or contact po@mymortuarycooler.com. Financing available via our financing page.
For facility packages, bid schedules, quantity pricing, freight coordination, submittals or option verification, add this item to an RFQ or contact U.S. Pathology Equipment before ordering. Confirm dimensions, utilities, accessories, delivery access and installation responsibility for your project.
Delivery methods, charges and estimated timing are confirmed for the selected equipment and destination. Inspect freight before installation and promptly document visible or concealed damage. Liftgate, limited-access, inside-delivery and other services must be included in the written order scope.
Current manufacturer documentation and the written order govern product coverage. Keep equipment uninstalled, unenergized, complete and in its original packaging while any return request is reviewed. Authorization is required before a return is shipped.
Move from one item to a coordinated equipment package, with product, room and procurement requirements reviewed together.